Chilled Storage Expansion Project

Gate Gourmet, a leading provider of airline catering solutions and provisioning, contacted CRS with a specific requirement for additional chilled storage with cross docks at their Heathrow Airport operations.

CRS had been engaged in ongoing discussions with Gate Gourmet regarding their need for additional chilled storage facilities. Time was of the essence for them, and Gate Gourmet required a swift response to meet their urgent storage requirements.

CRS emerged as the only company capable of delivering a comprehensive solution within the required timeframe. We also had a stock of new modules, as well as an in-house engineering team capable of making the necessary modifications.

Gate Gourmet Cross Docking solution

Project Scope

The primary objective of the project was to design and construct a complex of chilled storage facilities with integrated loading dock pods for cross docks.

CRS was tasked with delivering a turnkey solution, including designing the complex and coordinating with their docking partner to ensure seamless integration between the complex and the docks. The project had a strict timeline of 12 weeks, which included accommodating an ongoing installation on the same site.

Chilled Storage with Cross Docks

Cold Storage Solution

Our team of experienced engineers designed a complex that addressed Gate Gourmet's specific needs and unique requirements of the available Heathrow Airport area.

They optimised the layout to maximise storage capacity while ensuring efficient workflows for cross-docking operations. The design incorporated advanced temperature control systems to maintain the required storage conditions.

Despite the challenges, CRS executed the project successfully within the required timeline:

  • We ensured efficient scheduling and ongoing on-site installation while carefully planning and coordinating our activities to minimise disruptions and ensure a smooth process at the busy airport area.
  • Our commitment to meeting deadlines resulted in the successful completion of the project on the promised day. Our expert team’s proactive approach, effective project management, and close collaboration with stakeholders allowed us to deliver the chilled storage facilities within the 12-week timeframe.

Watch the installation at Gate Gourmet


Partner with CRS Cold Storage

If your organisation is seeking efficient, customised, and timely solutions, consider CRS as your trusted partner! Our specialist team is looking forward to discussing your storage needs; get in touch!


Inside the Cross Docking solution

Published by: CRS Cold Storage

⇐ Back to Case Studies